Open
Mededingingsprocedure met onderhandeling
The design, supply, installation and commissioning of a compost production line.
Publicatie-ID: 370413
Details
Opdrachtgever
N.V. HVCPublicatiedatum
12 maart 2025
Omschrijving
A new build compost production line, in accordance with the HVC’ Program of Requirements, consisting of a new: a) pre-treatment line for the “Vegetable, Fruit and Garden waste" (VFG); b) mixing line and; c) after-treatment line. Note: The existing composting hall remains, the new build CPL shall have some mechanical, electrical and automation interfaces with the units of the existing installations.